01
Step one: measure the edge and gap
Start by recording the array edge length, frame height and the gap between the panel underside and roof surface. Worked example: a two-row array has a bottom edge of 6.4 meters, a frame height of 35 millimeters and a roof gap of 80 millimeters. The trim must cover the gap, so you note both numbers, plus any obstacles like conduit or rail ends. Add a small allowance for cuts, then confirm the roof material and whether any walkway clearance must remain open for service access.
02
Step two: choose attachment and spacing
Pick a trim style that clips to the frame or rail without drilling the panel. In the example, the installer selects a clip-on skirt with fasteners every 600 millimeters, which means eleven attachment points across 6.4 meters, plus one at each end. Check that clips do not trap debris or block drainage, and leave small breaks where water and leaves can pass. Read the panel manufacturer's installation manual before touching the frame, because some warranties restrict how accessories can attach. Dry-fit one section first and adjust before cutting the rest.
03
Step three: inspect and schedule follow-up
After fitting, walk the edge and check alignment, firm clips, clean cut ends and unobstructed ventilation. In the example, the installer photographs each section, notes any gap near the conduit and adds a cap piece there. Record the trim model, length and fastener count for the job file so replacements are simple. Schedule a revisit after the first major storm or season change to look for loosened clips, nesting attempts and debris buildup. Follow local safety rules for roof access and fall protection whenever work happens at height.